HOME | PROJECT OVERVIEW | TEAM OVERVIEW | SMALL BUSINESS | CONTACT
|
|
|
 |
The proposed GIWW West Closure Complex is one of the world’s largest of its kind, featuring a pumping station capable of pumping storm water at a rate of 20,000 cubic feet per second, two navigable gates, one spanning 110 feet and a second spanning 225 feet, as well as construction and relocation of a levee
and flood wall.
404c Flood Wall/Water Control Structure
Pump Station
Metal Fabrication of Sector Gates
Site Work |
Excavation
Piling
Concrete
Aggregate |
Electrical/Mechanical
Reinforcing Steel
Stone Protection |
|
|
|
|
|