HOME | PROJECT OVERVIEW | TEAM OVERVIEW | SMALL BUSINESS | CONTACT

The proposed GIWW West Closure Complex is one of the world’s largest of its kind, featuring a pumping station capable of pumping storm water at a rate of 20,000 cubic feet per second, two navigable gates, one spanning 110 feet and a second spanning 225 feet, as well as construction and relocation of a levee
and flood wall.

404c Flood Wall/Water Control Structure

Pump Station

Metal Fabrication of Sector Gates

Site Work

Excavation

Piling

Concrete

Aggregate

Electrical/Mechanical

Reinforcing Steel

Stone Protection